Project Details For Miller Industries
Owner:
Location:
Scope:

New manufacturing facility, renovation of existing manufacturing facility, and full campus site improvements.


Description:

Site Improvements: 23.5 acre campus removed all existing Heavy duty paving, gravel and concrete paving, replace all production areas and process areas with RCC (12 acres +/-), replaced all gravel employee parking areas with light duty asphalt, concrete curbs and planted islands, placed full fence enclosure around entire, automated security enclosures, repair and install new storm water systems, and install curb and stripping on Main road into plant and throughout campus. Approximate project value $3,000,000.00

New Manufacturing:  Coordinated all installation, construction, and integration of new facility including building construction, utility infrastructure construction, installation of process equipment and utilities, office spaces, installation, hook-up and integration of state of the art robot welding systems, shot blast and paint booths, low temp paint curing oven, conveyor systems for paint and assembly areas, air cleaners, overhead bridge cranes, roll up steel and speed doors, electronic security systems, and all other process support equipment.  New facility totals 60,000 sq. ft. under roof with 55,000 fully enclosed and conditioned environment.  Approximate project cost is $6,000,000.00

Existing Facility:  Full renovation of existing and construction of new utility facilities to support process.  Removal of existing facilities and installation of process equipment and utilities, office spaces, installation, hook-up and integration of state of the art robot welding systems, shot blast and paint booths, air cleaners, overhead bridge cranes, roll up steel and speed doors, electronic security systems, and all other process support equipment.  All while working in and around existing process facilities.  Existing facility space approximately 47,000 sq. ft. under roof, with addition of approximately 9000 sq. ft of outside covered warehouse area.  Approximate project cost is $4,000,000.00.

Misc Projects:  Coordinate and integrated the new fasia to existing plant building, and construction of new hazardous materials storage facility and Delivery building on campus.  Total Project value of $500,000.00.